Walls in the southern courtyard

In connection with the Statens Fastighetsverk's fire-proofing of the roofs at Kalmar castle, water pipes were excavated in the southern castle yard. The preliminary investigation was carried out in the form of shaft monitoring, in February 2009, and its purpose was to ensure that no walls or other structures were damaged. During the preliminary investigation, three walls were found. Download the report