New floor in Långlöts cows

Due to mold problems in Långlöt church, it has been decided to change the floor construction at the front of the choir, which required lowering the current underground level by approximately 0.2 meters. In connection with this, a preliminary investigation was carried out in the form of shaft monitoring on an approximately 7 x 3 m area in the chancel. That area was formerly cemetery land for one of the previous churches that stood on the site, and the current area became part of the church when the last church was built, at the end of the 18th century. No older layers or structures were encountered during the survey. Download the report